IEE342I
cm REJECTED-TASK BUSY

Explanation

While processing a STOP (P) or MODIFY (F) command for this task, the system detected that either:
  • For a MODIFY command: The current limit on the number of outstanding MODIFY commands for the task has been reached.
  • For a STOP command: There is an outstanding STOP command in process for the task.
  • For either a MODIFY or STOP command: The task is in a step-must-complete mode.

For example, if a STOP JOBX command is entered while JOBX was running and a MODIFY JOBX,parameters was issued, the system will issue message IEE342I.

In the message text:
cm
The command entered (for example, STOP, P, MODIFY, or F).

System action

The system rejects the command.

Operator response

If necessary, enter the command again after the previous command or commands have completed processing.

Source

Master scheduler

Module

IEECVETE, IEE0703D, IEECB806

Routing code

*

Descriptor code

5