For system-managed rebuild, the system uses the values from the
CFRM active policy with the following exceptions:
- The system does not automatically initiate system-managed rebuild
based on REBUILDPERCENT calculations. The specification of REBUILDPERCENT
in a CFRM policy structure description applies to the percentage
of connections that lost connectivity to the structure. System-managed
rebuild is not supported for lost connectivity.
- If there is a pending CFRM policy change that modifies the structure
SIZE or INITSIZE, and all connectors specified IXLCONN ALLOWALTER=YES,
the system will allocate the new structure using the sizes from the
pending policy, subject to the requirement that the resulting size
be large enough to contain the data to be copied from the old structure.
In some cases, the resultant structure size may be larger than the
maximum structure SIZE specified in the CFRM policy.
- If there is a pending CFRM policy change that modifies the structure
SIZE or INITSIZE, and not all connectors specified IXLCONN ALLOWALTER=YES,
the policy changes will remain pending after the system-managed rebuild.
For system-managed duplexing rebuild, the system's use of the CFRM
policy values is as follows:
- The DUPLEX(ENABLED) or DUPLEX(ALLOWED) specification determines
whether the installation intends a structure to be eligible for duplexing.
- A change in the CFRM policy to DUPLEX(DISABLED) causes system-managed
duplexing rebuild to stop.
- System-managed duplexing rebuild cannot be started when CFRM policy
changes are pending for the structure.