Resource status field information (positions 6–10)

The following resource status information can appear in character positions 6–10 in the resource status field in VTAM® messages.

If a character position is not used, a hyphen (-) is displayed. For example, ACTIV--S-- is displayed if the logical unit or cross-domain resource (CDRSC) is in an active state and defined as a shadow resource.

Table 1. Resource status field information

Resource
information

Character
position

 
Meaning

B 10 The link station is functioning as a backup for another link station (in certain migration situations).
C 8 DACTLINK GIVEBACK processing is being done for a LINE as a result of a VARY RELEASE GIVEBACK command issued for an NCP.
D 10 The resource has been added or moved using dynamic reconfiguration.
E 10 The link station or cross-subarea link has been explicitly activated.
F 10 The link station was implicitly activated as a backup.
G 10 The resource is a logical line.
I 10 The link station or cross-subarea link has been implicitly (or automatically) activated, as a result of activating a resource to which this link or link station is subordinate or adjacent. See z/OS Communications Server: SNA Operation for an explanation of using the RNAME operand or the U operand to automatically activate link stations.
L 8 An independent LU is using this PU as an adjacent link station.
M 6 Takeover is in progress for the PU.
N 7 The resource was not originally owned by the host processing the DISPLAY command.
R 9 A test-resolve retry condition exists for a local area network active leased line. This condition indicates that VTAM LAN support is sending test LPDUs to a station to resolve a route and will continue to do so until either the station is active or the operator deactivates the line.
S 8 The logical unit or cross-domain resource (CDRSC) is defined as a shadow resource. See z/OS Communications Server: SNA Network Implementation Guide for more information.
T 10 The resource (link, physical unit, or logical unit) is attached through the programmed resource capability (NTO) of the NCP.
W 8 The physical unit is defined with ALLOWACT=YES.
X 9 The resource was dynamically created.
Y 10 The cross-domain resource (CDRSC) was created dynamically.