Execution results

Results for IBM® Rational® Integration Tester test suites that are executed from HP Quality Center are displayed in the Results Gallery perspective of Rational Integration Tester. However, results for Rational Integration Tester tests that are executed from HP Quality Center are only displayed in the Results Gallery perspective of Rational Integration Tester if the project is configured to use a test cycle.

In HP Quality Center, last-run results can be viewed in the execution grid, and historical results can be viewed from the Test Instance Details window.

For information about test cycles in Rational Integration Tester, see Test cycles.

The overall status of a test or test suite is displayed in the execution grid, and detailed results (taken from the Rational Integration Tester console) for the selected entry are displayed in the Last Run Result window below the grid.

Historical results are displayed in All Runs, in the Test Instance Details window. To see the results, double-click an entry in the execution grid or right-click and select Test Instance Details.

To view the detailed results for any run, select its entry and view the results in the lower half of the Test Instance Details window.

Note: In both places, if console output generated by Rational Integration Tester exceeds 100 lines, only the first 50 and the last 50 lines are stored and displayed.

Included in the console output are a link to view the execution results in Rational Integration Tester (in the Results Gallery) and a link to view the detailed report in Rational Integration Tester Results Server. The Results Server URL is generated according to the Results Server URL value in the project settings for Rational Integration Tester, but note that Results Server must be installed to view the detailed report.

Note: If you do not have a valid database connection that is configured in Rational Integration Tester, the Results Server link is omitted from the output. Likewise, if the HP Quality Center test is linked to a Rational Integration Tester test and the project is not configured to use a test cycle, the View and Result links are omitted.

If you are using Results Server, ensure that your Internet Explorer options are set to not reuse windows for launching shortcuts. You can disable this option in Tools > Internet Options. Click the Advanced tab and, under Browsing, disable the option.


Feedback