subscribe iconSubscribe to this information
POWER7 information

Changing hardware for one or more consoles

Learn how to change multiple hardware consoles, such as moving two or more adapters, while the logical partition and managed system remain powered on.

This procedure requires a workstation other than the current console device to make a console change. If you do not have another workstation available, you must shut down the IBM® i logical partition.

You must also use the Hardware Management Console (HMC) to install, add, or remove the console resource unless you plan to power off the managed system. If you must power off the managed system, complete the steps in the Changing the console by powering off the managed system topic.

Before you begin, plan to deallocate the LAN adapter if you will not be using a local console on a network (LAN) configuration, even as a backup, or if you will not be using the service tools server. After the LAN adapter is deallocated, you can move it or use it for another purpose. You must also use a workstation other than a local console on a network (LAN) because the steps to deallocate the adapter cause the console to disconnect.

Important: You must change the console tag to a value other than Operations Console (LAN). Otherwise, the adapter is reallocated the next time that you start the server.

To deallocate the LAN adapter that is currently associated with a local console on a network (LAN), use the system service tools (SST).

To unlock the SST option, perform the following steps:
  1. Access service tools using SST.
  2. Select Work with service tools user IDs and devices.
  3. Select Configure service tools LAN adapter.
  4. Press F6 to clear the old values, and then F7 to store the new values.
  5. Press F3 to exit.
To exchange adapters, complete the following steps:
  1. Select the managed system and logical partition where you want to exchange adapters:
    1. In the navigation area, click Systems Management > Servers.
    2. In the contents area, select the managed system with which you want to work.
    3. In the contents area, select the logical partition that you want to change.
  2. Click Tasks > Dynamic Logical Partitioning > Physical Adapters > Move or Remove to display a list of adapters that can be removed dynamically. If your adapter is not listed, you might have to power off the logical partition and the managed system to change the adapter.
  3. Select the adapter to remove dynamically, and then click OK.
  4. Follow any additional instructions until you have removed the appropriate adapter.
  5. To add a new adapter after you have removed one, repeat steps 2 through 4 except select the Add option instead of the Move or Remove option.
  6. Attach any necessary cables to the adapter.
  7. Select the option that best fits your situation. More than one option might apply.
    • If the new console is not an Operations Console, start a connection from the device at this time.
    • If you are changing the current console to Operations Console, create an Operations Console connection by following the instructions in the IBM i Information Center. For details, see Accessing Operations Console information in the IBM i Information Center.
    • If you currently have a configured connection for Operations Console and you will not be using it as a backup console, complete the following steps to delete the configuration:
      1. Select the configuration name.
      2. Click Delete on the Connection menu.
      3. Click Yes to confirm the deletion.
  8. Complete changing the console. For instructions, see Completing a console change with the logical partition powered on.


Send feedback | Rate this page

Last updated: Thu, October 10, 2013