Removal and replacement procedures for the 8233-E8B and 8236-E8C
Maintenance information for the IBM® Power® 750 Express (8233-E8B) and IBM Power 755 (8236-E8C) includes procedures
for start-of-call, isolation, and removal and replacement.
Verifying a repair
Use these procedures to verify hardware operation after
making repairs to the system.
Closing a service call
Perform these procedures to close serviceable events, clear
hardware messages, and prepare the server to return to the customer.