APAR status
Closed as program error.
Error description
PROBLEM: Intermittent errors regarding date while using the "Assign Available Labor" tool in Graphical Assignment application STEPS TO REPRODUCE: 1. Go to Graphical Assignment (GA) application and go to "Assignment View" tab, assign an unassigned work order to a labor by drag and drop 2. Save the record 3. Right click on same work order and click Unassign 4. Do not save the record 5. Highlight the same work order again and right click on a labor, click Assign Available Labor 6. Receive error "BMXAA4589E The Start Date must be before the finish date" EXPECTED RESULTS: The work order should be able to be assigned using dialog without error REPORTED IN VERSION: Maximo Asset Management 7.6.0.9 IBM Maximo Asset Management Scheduler 7.6.7.0
Local fix
The workaround would be to save at step 4
Problem summary
**************************************************************** * USERS AFFECTED: * * Users of the Graphical Assignment application in Scheduler * * 7.6.7. * **************************************************************** * PROBLEM DESCRIPTION: * * ENTRY ERRORS REGARDING DATE WHILE USING THE "ASSIGN * * AVAILABLELABOR" TOOL * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
A code fix has been made.
Temporary fix
Comments
APAR Information
APAR number
IJ16088
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-05-12
Closed date
2019-05-20
Last modified date
2019-05-20
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
20 May 2019