IBM Support

IJ13970: IN SCHEDULER WO THAT START BEFORE THE SCHEDULE AND END AFTER ARE NOT INCLUDED WHEN USING RESTRICT WORK TO DATES

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • In Scheduler if you have a WO that has a Scheduled Start before
    the start of your Schedule (or Work List) and a Scheduled
    Finish after the end of your Schedule (or Work List) it is not
    included on the schedule when using the Restrict Work To Dates
    checkbox.   It should be included.
    
    Steps to Reproduce:
    1. Create a new WO with Duration of 10.
    2. Give it a Scheduled Start on the first of next Month and a
    Scheduled Finish of the end of next month.
    3. Save.
    4. Go to Graphical Scheduling.
    5. Create a new Schedule.
    6. Check the Restrict Work To Dates checkbox.
    7. Set the Start Date to the 10th of next month and the End to
    the 20th of next month.
    8. Create a Work Query to select the new WO created above.
    9. Click on Save.
    
    RESULTS:
    You get System Message:  BMXAA9352I - There are no work records
    for TEST01 restrict test.
    and there are no WO on the Graphical View tab.
    
    EXPECTED RESULTS:
    This WO should be included on this Schedule as it is being
    worked when the Schedule is active.
    
    VERSION:
    Reported on 7.6.1.0 and reproduced with latest IFix and also on
    7.6.1.1.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * scheduler users                                              *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * In Scheduler if you have a WO that has a Scheduled Start     *
    * before                                                       *
    * the start of your Schedule (or Work List) and a Scheduled    *
    * Finish after the end of your Schedule (or Work List) it is   *
    * not                                                          *
    * included on the schedule when using the Restrict Work To     *
    * Dates                                                        *
    * checkbox.   It should be included.                           *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.1 of Base
    Services(Scheduler 7673)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ13970

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-02-18

  • Closed date

    2019-02-22

  • Last modified date

    2019-02-22

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
22 February 2019