IBM Support

IJ13941: GRAPHICAL REPRESENTATION OF NON-WORKING TIME IS IN THE WRONG POSITION WHEN ADJUSTED VIA MODIFY PERSON AVAILABILITY

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • The Maximo Server is located in Time Zone America/Toronto (-5),
    however the logged in user has a Time Zone as America/Halifax
    (-4).
    When Modify Person Availability is used to modify Work Dates for
    a single day or multiple
    days, once you click OK to return to Assignment View tab, the
    area for the non-working time
    is in the wrong position.
    The user has to logout and back into Maximo to see the proper
    rendering of the non-available time work bar.
    
    
    STEPS TO REPRODUCE:
    Pre-requisite:
    Log in as wilson/wilson
    Go to Administration<Calendars
    Recall Calendar =DAY, set Start Date and End Date, ensure that
    End Date includes this
    year.
    Select Action<Apply/Define Shifts
    Click New Row under shifts, Shift=DAY, Start Day=SUNDAY, Days in
    Pattern=7
    Click Define Pattern
    Leaving Sequence of Pattern Day 001 and 002 with defaults start
    with 002 Start Time = 7:00 AM
    End Time = 3:00 AM, tab out
    Repeat for Sequence of Pattern Day 003, 004, 005, 006
    Click OK, check Shift = DAY
    Click Apply Shift
    Apply for entire calendar
    
    Go to Administration<Resources<Labor
    Recall Labor=FINLEY, Calendar=DAY, Shift=Day, Time
    Zone=America/Halifax (GMT - 4 DST/Y) Atlantic Time (Canada)
    Save record
    
    Click on Profile<Default Information for current user
    Time Zone =America/Halifax (GMT - 4 DST/Y) Atlantic Time
    (Canada)
    Click OK
    
    NOTE: The server is in EST time zone
    
    
    Steps to recreate
    Log out and Log in as wilson/wilson
    Go to Work Order Tracking application
    Insert a new work order
    Scroll down to Scheduling Information data area, Scheduled Start
    Date=future_date 7:00 AM
    Schedule Finish Date=Same_Day 12:00 PM, Duration=5:00
    Save record
    Go to Plans tab and under Labor sub-tab click New Row,
    Craft=CARP, Quantity=1, Regular Hours=5:00
    Go to Planning & Scheduling<Graphical Assignment application
    Insert New Record, Work List=TZWL, Calendar=DAY
    Organization=EAGLENA, Shift=DAY
    Scroll down to Work Queries and click New Row, Data
    Source=WORKORDERS, Where Condition=(wonum like '%DM1203%')
    Save record
    Click on Assignment View tab
    Right-click Labor Finley, from resulting menu options pick
    Modify Person Availability
    In resulting dialog box in Work Dates data area place a
    checkmark next to first and second day
    Click Mass Modify button, Reason Code=SICK, click OK
    Click OK
    
    RESULT: the Grey bars denoting un-availability for selected days
    are ALL left shifted starting, starting under 5:30 AM
    EXPECTED RESULT: the Grey bar denoting un-availability should
    start under 7:00 AM
    
    NOTE: The Save icon is not available
    
    Go to Startcenter
    Go to GA and recall record above
    Click on Assignment View
    RESULT: SAME as above
    
    Log out
    Log in
    Go to GA
    RESULT: Now the bars are correctly aligned
    
    EXPECTED RESULTS:
    Bars should be correctly aligned so as not to mislead user
    
    
    
    REPORTED IN VERSION:
    Tivoli's process automation engine 7.6.1.0
    IBM Maximo Asset Management Scheduler 7.6.7.1 Build
    20180718-1141 DB Build V7671-16
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Assignment application in Scheduler   *
    * 7.6.7.                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * GRAPHICAL REPRESENTATION OF NON-WORKING TIME IS IN THE       *
    * WRONGPOSITION WHEN ADJUSTED VIA MODIFY PERSON AVAILABILITY   *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been delivered to the stream.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ13941

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-02-19

  • Closed date

    2019-02-20

  • Last modified date

    2019-02-20

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
20 February 2019