IJ11513: WORK IS NOT SHOWING AS INTERRUPTIBLE IN GRAPHICAL ASSIGNMENT BUT IS IN THE GRAPHICAL SCHEDULING APPLICATION.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • The work is not showing as interruptible in the Graphical
    Assignment (GA) application Workview Tab, but is showing as
    interruptible in the Graphical Scheduling application.
    STEPS TO REPRODUCE:
    1. Go to WO Tracking, create a WO.
    2.. Set Duration of 6 hours.
    3. Check the Interruptible check box.
    4. Fill in the "Interruptible shift" field (eg. Day shift).
    5. Add some tasks to the WO including Estimated Duration.
    7. In the scheduling section, Check the "Include in Schedule"
    check box.
    8. On the Labor sub-tab, add a craft, quantity, Save.
    
    9.. Go to the Graphical Scheduling (GS) app. and create a
    Schedule (called FARMING)
    10. Add a Calendar (24HOUR in this case)
    11. Add a Shift (Day-7 in this case - a 12 hour shift)
    12. In the "Work Queries" section add a Query Name and a Where
    condition to display the Work Order you created above.
    13. Go to the Graphical View tab and view the work.
    14. Drag the duration of the task so that it starts in one
    shift, is interrupted by an off-shift period and ends in the
    next shift.
    15. Perform a Critical Path Method (CPM) by selecting the
    button from the toolbar.
    16. You can see that the work is shown as interruptible (it is
    interrupted by the off-shift time). This is expected.
    17. Go to the Graphical Assignment (GA) app.
    18. Go to More Actions and select Create a Work List from
    Schedule and select the FARMING schedule you created earlier to
    bring it into the GA app. Save.
    19. Go to the Assignment View Tab.
    20. Assign the work to someone (Adams in this case).
    21. The work is not showing as interruptible. This is NOT
    expected.
    
    RESULTS:
    The work is not showing as interruptible in the GA app Workview
    Tab, but is showing as interruptible in the GS application.
    EXPECTED RESULTS:
    The GA app should show also show the work as interruptible.
    REPORTED IN VERSION:
    IBM Maximo Asset Management Scheduler 7.6.7.1
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Assignment application.               *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * WORK IS NOT SHOWING AS INTERRUPTIBLE IN GRAPHICAL ASSIGNMENT *
    * BUT IS IN THE GRAPHICAL SCHEDULING APPLICATION.              *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been delivered to the stream.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ11513

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-11-25

  • Closed date

    2019-01-18

  • Last modified date

    2019-01-18

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
18 January 2019