IBM Support

IJ10475: RESOURCES LOAD AND AVAILABILITY ON GRAPHICAL SCHEDULING DOESN'T DISPLAY FULL NUMBER OF LABOR HOUR FOR JOB PLANS

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Problem Title
    =============
    Resources Load and Availability on Graphical Scheduling doesn't
    display full number of labor hour for Job Plans
    
    
    Problem details:
    =================
    While creating a PM schedule record in Graphical Scheduling
    Application, you can go to the Work View, and scroll down to
    the Resources Chart to see that the required resources is not
    considering the number of labors in the Job Plan,
    For example a Job Plan requiring work for 2 labors (Quantity 2)
    with 18 hours each, however, in the Gantt View you can see
    that it shows that what is required in only 18 hours, where it
    should be 36 hours (18 * 2),
    
    
    Application
    ========
    Graphical Scheduling
    
    
    Steps to reproduce:
    ===================
    1. Go to Planning - Job Plans
    
    2. NEW JP TEST
    
     Template Type: Maintenance
     Add 4 JP Tasks with Duration
     In the Labor sub tab, add a Craft CARP with Quantity 2 and
     Hours 18
    
    3. Change status to Active
    
    4. Go to Preventive Maintenance
    
    5. New PM TEST
     Add JP TEST
     Work type: PM
    
    6. Approve PM
    
    7. More Actions Generate Forecast for 7 days
    
    8. Go to Graphical Scheduling
    
    9. New Schedule TEST
     Calendar DAY
     Shift DAY
    
    10. Add query pnmum='TEST'
    
    11. Check the Gantt View
    
    
    Result: In Resources Load and Availability area, the graphical
    representation for labor shows 18 hours
    
    Expected Result: Value should be 36 (18*2)
    
    
    Product Version
    ========================
    IBM TPAE 7609 IFIX 20180724
    IBM Maximo Asset management 7609 Build 20171127
    IBM Maximo Asset management Scheduler 767 Build 20171127
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Scheduling application in Scheduler   *
    * 7.6.7.                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * RESOURCES LOAD AND AVAILABILITY ON GRAPHICAL SCHEDULING      *
    * DOESN'TDISPLAY FULL NUMBER OF LABOR HOUR FOR JOB PLANS       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been delivered to the stream.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ10475

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-10-16

  • Closed date

    2018-10-25

  • Last modified date

    2018-10-25

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
25 October 2018