APAR status
Closed as program error.
Error description
PROBLEM: In GSLP, Collapsing the side bar menu, creates a misalignment between the Gant and the resource table PERFORMANCE ISSUE: NO STEPS TO REPRODUCE: * Create a schedule in GSLP * Display it in the graphical view * Open the resources view * Collapse the side bar menu CURRENT ERRONEOUS RESULT: * The Gant view and the resource view re not aligned and in sync anymore EXPECTED RESULT: * The 2 views are perfectly aligned and in sync. ADDITIONAL INFO: ENVIRONMENT (SYSTEM INFO): App Server IBM WebSphere Application Server 9.0.0.7 Version Tivoli's process automation engine 7.6.1.0 Build 20180718-1141 DB Build V7610-83IBM Maximo Asset Management Work Centers 7.6.0.4 Build 20180712-1824 DB Build V7604-119IBM Maximo for Aviation 7.6.7.0 Build 20180731-1633 DB Build V7670-66IBM Maximo Asset Management Scheduler 7.6.7.1 Build 20180718-1141 DB Build V7671-13IBM TPAE Integration Framework 7.6.1.0 Build 20180717-1722 DB Build V7610-02IBM Maximo Asset Management Scheduler Plus 7.6.7.1 Build 20180718-1141 DB Build V7671-01IBM TPAE OS/REST Framework 7.6.1.0 Build 20180718-1141 DB Build V7610-38IBM Maximo Asset Management 7.6.1.0 Build 20180710-1126 DB Build V7604-01IoT Connection Utility 7.6.0.1 Build 20180709-1524 DB Build V7601-02 Server OS Windows Server 2012 R2 6.3 Server DB DB2/NT64 11.1 (SQL11010) LOCAL FIX: SECURITY IMPACT (Y/N): N
Local fix
Click on the Refresh at Resource View
Problem summary
**************************************************************** * USERS AFFECTED: * * Users of the Graphical Scheduling Large Projects in * * Scheduler 7.6.7 * **************************************************************** * PROBLEM DESCRIPTION: * * COLLAPSING THE SIDE BAR MENU, CREATES A MISALIGNMENT BETWEEN * * THE GANT AND THE RESOURCE TABLE * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
A code fix has been delivered.
Temporary fix
Comments
APAR Information
APAR number
IJ10304
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-10-08
Closed date
2018-10-09
Last modified date
2018-10-09
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
R767 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
09 October 2018