IBM Support

IJ10304: IN GSLP, COLLAPSING THE SIDE BAR MENU, CREATES A MISALIGNMENT BETWEEN THE GANT AND THE RESOURCE TABLE

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • PROBLEM:  In GSLP, Collapsing the side bar menu, creates a
    misalignment between the Gant and the resource table
    PERFORMANCE ISSUE: NO
    STEPS TO REPRODUCE:
    * Create a schedule in GSLP
    * Display it in the graphical view
    * Open the resources view
    * Collapse the side bar menu
    CURRENT ERRONEOUS RESULT:
    * The Gant view and the resource view re not aligned and in
    sync anymore
    EXPECTED RESULT:
    * The 2 views are perfectly aligned and in sync.
    ADDITIONAL INFO:
    ENVIRONMENT (SYSTEM INFO):
    App Server IBM WebSphere Application Server 9.0.0.7
    Version Tivoli's process automation engine 7.6.1.0 Build
    20180718-1141 DB Build V7610-83IBM Maximo Asset Management Work
    Centers 7.6.0.4 Build 20180712-1824 DB Build V7604-119IBM
    Maximo for Aviation 7.6.7.0 Build 20180731-1633 DB Build
    V7670-66IBM Maximo Asset Management Scheduler 7.6.7.1 Build
    20180718-1141 DB Build V7671-13IBM TPAE Integration Framework
    7.6.1.0 Build 20180717-1722 DB Build V7610-02IBM Maximo Asset
    Management Scheduler Plus 7.6.7.1 Build 20180718-1141 DB Build
    V7671-01IBM TPAE OS/REST Framework 7.6.1.0 Build 20180718-1141
    DB Build V7610-38IBM Maximo Asset Management 7.6.1.0 Build
    20180710-1126 DB Build V7604-01IoT Connection Utility 7.6.0.1
    Build 20180709-1524 DB Build V7601-02
    Server OS Windows Server 2012 R2 6.3
    Server DB DB2/NT64 11.1 (SQL11010)
    LOCAL FIX:
    SECURITY IMPACT (Y/N): N
    

Local fix

  • Click on the Refresh at Resource View
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Scheduling Large Projects in          *
    * Scheduler 7.6.7                                              *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * COLLAPSING THE SIDE BAR MENU, CREATES A MISALIGNMENT BETWEEN *
    * THE GANT AND THE RESOURCE TABLE                              *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been delivered.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ10304

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-10-08

  • Closed date

    2018-10-09

  • Last modified date

    2018-10-09

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
09 October 2018