IJ08703: GS LOSES DATE RIBBON START WHEN USING NEXT SCHEDULE TO MOVE FROM SCHEDULE TO SCHEDULE ON THE GRAPHICAL VIEW TAB.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • In Graphical Scheduling (GS) if you use Next Schedule or
    Previous Schedule while viewing a Schedule on the Graphical
    View tab, the start of the date ribbon for the subsequent
    Schedules no longer gets used. This probably happens to other
    information about the Schedule that is part of the State, too.
    It happens for zoom factor, too.
    
    If you view a schedule, go back to the List tab, view the next
    Schedule, go back to List and view the next schedule, the date
    ribbon start saved for each one is used as it should be used.
    
    But if go the Graphical View tab and view the first Schedule
    and then use the Next Schedule arrow on the toolbar to move to
    the next Schedule, the date ribbon start of the first Schedule
    is used for all subsequently viewed Schedules. They do not
    retrieve the State and use that date ribbon start as they
    should.
    
    STEPS TO REPRODUCE:
    
    1. Go to GS and create 3 schedules for different sets of WO.
    They can all have the same Calendar and Shift and Start/End
    dates. Set the Start date to be the first of the next month and
    set the End to be the last day of the next month. If it is
    September, use October 1 and October 30.
    2. Save each one.
    3. View the first one on the Graphical View tab. Adjust the
    Date Ribbon so that the first date shown, the rightmost date,
    is the first of the month. Save if the Save button un-dims.
    Click on the List tab.
    4. View the second one on the Graphical View tab. Adjust the
    Date Ribbon so that the first date shown, the rightmost date,
    is the second of the month. Save if the Save button un-dims.
    Click on the List tab.
    5. View the third one on the Graphical View tab. Adjust the
    Date Ribbon so that the first date shown, the rightmost date,
    is the third of the month. Save if the Save button un-dims.
    Click on the List tab.
    6. On the List tab select the first schedule and view it on the
    Graphical View, you will see that the first date shown is the
    first of the month. Go back to List tab.
    7. On the List tab select the second schedule and view it on
    the Graphical View, you will see that the first date shown is
    the second of the month. Go back to List tab.
    8. On the List tab select the third schedule and view it on the
    Graphical View, you will see that the first date shown is the
    third of the month. Go back to List tab.
    9. That is the way it should work.
    10. Now on the List tab select the first schedule and view it
    on the Graphical View, you will see that the first date shown
    is the first of the month.
    11. While still on the Graphical View tab, use the Next
    Schedule arrow on the toolbar to move to the second schedule.
    You will see that the first date on the list tab is not the
    second of the month as it should be but instead is the same as
    that of the first schedule, the first of the month.
    12. While still on the Graphical View tab, use the Next
    Schedule arrow on the toolbar to move to the third schedule.
    You will see that the first date on the list tab is not the
    third of the month as it should be but instead is the same as
    that of the first schedule, the first of the month.
    13. If you had opened the third schedule first and then used
    the Previous Schedule toolbar arrow to move back to the second
    and then the first schedules, you would see that the third of
    the month would be used as the first date on the date ribbon.
    The data is used from whichever schedule you open first.
    
    CURRENT ERRONEOUS RESULT:
    
    That for the subsequent schedules it does not look up the saved
    state for those schedules but uses what is on the screen left
    over from the first schedule.
    
    EXPECTED RESULT:
    
    The subsequent schedules should retrieve their own saved states
    even when opened by using Next/Previous Schedule.
    
    ENVIRONMENT (SYSTEM INFO):
    
    7.6.0.9 with IFix 004 or above and 7.6.1.0
    

Local fix

  • Do not use Next/Previous Schedule.
    Or you can collapse the Resource view on the Graphical View tab
    and then Next/Previous Schedule.
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Scheduler Users                                              *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * When using prev/next the Gantt would retain the Zoom level   *
    * of the previous Gantt                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • Fixed
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ08703

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-08-21

  • Closed date

    2018-09-12

  • Last modified date

    2018-09-12

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]