IJ05583: WORK ORDER REPAIR FACILITY - THE ASSIGNMENT LOCATION SECTION IS NOT WORKING AS IT SHOULD START DATE + DURATION = END DATETIME

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • PROBLEM: Work Order - Repair Facility - ASSIGNMENT Location
    section is not working as it should End Dates MUST BE START
    DATE PLUS THE DURATION GETTING THE END DATE
    PERFORMANCE ISSUE: NO
    STEPS TO REPRODUCE:
    - Create some Work Duration and Start Date
    - Check the Repair Facility Flag (Remember that the Repair
    Facility Flag should be turn on at the Organization level)
    Steps to Reproduce
    1-) Go to the Work Order tracking application
    2-) Create a New record and setup with duration and Schedule
    Start
    3-) Set the Repair Facility value over the field at Work Order
    man page
    4-) Move over the Assignment Tab and Check the Location
    Assignment section
    CURRENT ERRONEOUS RESULT:  The Values of the Schedule End Dates
    was not setup according with Start  + Duration
    EXPECT RESULT: The Location record should get Start and End
    value
    ADDITIONAL INFO: NO
    ENVIRONMENT (SYSTEM INFO):
    App Server Weblogic Application Server 12.1.1.0
    Version
    Tivoli's process automation engine 7.6.0.9-IFIX20180330-1643
    Build 20171127-0100 DB Build V7609-45 HFDB Build HF7609-04
    IBM TPAE Integration Framework 7.6.0.9 Build 20171127-2330 DB
    Build V7609-32
    IBM Maximo Asset Management Scheduler Plus 7.6.7.0 Build
    20171127-0100 DB Build V7670-01
    IBM Maximo Asset Management Scheduler 7.6.7.0 Build
    20171127-0100 DB Build V7670-56 HFDB Build HF7670-12
    IBM Maximo Asset Management Work Centers 7.6.0.3 Build
    20171121-0723 DB Build V7603-175
    Server OS Windows Server 2012 R2 6.3
    Server DB Oracle 11.2 (Oracle Database 11g Enterprise Edition
    Release 11.2.0.3.0 - 64bit Production With the Partitioning,
    OLAP, Data Mining and Real Application Testing options)
    (c) Copyright IBM Corp. 2017
    LOCAL FIX: N/A
    SECURITY IMPACT (Y/N): N
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * maximo scheduler users                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Work Order - Repair Facility - ASSIGNMENT Location           *
    * section is not working as it should End Dates MUST BE START  *
    * DATE PLUS THE DURATION GETTING THE END DATE                  *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixpack  Release 7.6.1.0 of Base Services or request   *
    * an interim fix                                               *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.0 of Base
    Services(Scheduler 7671)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ05583

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-04-09

  • Closed date

    2018-04-17

  • Last modified date

    2018-04-17

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
17 April 2018