IJ04265: GS OPT - ASSET/LOCATION MAINTENANCE/OPERATING CALENDARS CONFLICT WITH WORK PERIODS

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • When asset/location maintenance/operating calendars
    ended/started at same time as each other or main calendar, opt
    would error out
    PROBLEM: In some situations the When the Work Period (Shift)
    has the same Start and End time the Model will fail
    Pre Conditions
    - Create some Work with Resources need
    - Create a Schedule at the Graphical Scheduling application
    that bring those work orders and set the Scenario Allow as true
    - Make sure to relate to the Work Order Asset or Location that
    contains Maintenance and Operational calendar as the same of
    the Shift Start and End times
    - Setup the Decision Optimization to be used
    Steps to Reproduce
    1-) Go to the Graphical Scheduling application
    2-) Create a New Resource Scenario
    3-) Run the optimization
    PROBLEM: The Optimization will fail to run
    EXPECT RESULT: The Optimization should be run with the
    Maintenance/ Operational Calendar
    That Affects the Capacity one too.
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * maximo scheduler users                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * In some situations the When the Work Period (Shift)          *
    * has the same Start and End time the Model will fail          *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixpack  Release 7.6.1.0 of Base Services (Scheduler   *
    * 7671)or request an interim fix                               *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.0 of Base
    Services(Scheduler 7671)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ04265

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-02-19

  • Closed date

    2018-04-17

  • Last modified date

    2018-04-17

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]