IJ04258: GS - BAD ERROR MESSAGE WHEN ATTEMPTING TO RUN OPTIMIZATION FROM THE DEFAULT SCENARIO

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • PROBLEM: When the user has the authorization to run the
    Optimization (Sign Option Disable) the optimization action will
    be available for the costumer but once it should run just over
    scenario it is displaying the wrong message: BMXAT1064E -
    Optimization can only be run on work orders, not PM forecasts.
    Pre Conditions
    - Create some Work
    - Create a Schedule at the Graphical Scheduling application
    that bring those work orders
    Steps to Reproduce
    1-) Go to the Graphical Scheduling application
    2-) Open you project and move to the More Information tab
    3-) Mark as True the Scenarios allow
    4-) Change the Status of the record to Approved
    5-) The Run Optimization action should be available
    6-) Click at run Optimization action
    PROBLEM: The user will get BMXAT1064E - Optimization can only
    be run on work orders, not PM forecasts.
    EXPECT RESULT: The user should be warning that the Default
    scenario is not allow to run the optimization
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * maximo scheduler users                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * When the user has the authorization to run the               *
    * Optimization (Sign Option Disable) the optimization action   *
    * will                                                         *
    * be available for the costumer but once it should run just    *
    * over                                                         *
    * scenario it is displaying the wrong message: BMXAT1064E -    *
    * Optimization can only be run on work orders, not PM          *
    * forecasts.                                                   *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixpack  Release 7.6.1.0 of Base Services (Scheduler   *
    * 7671)or request an interim fix                               *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix....The fix for this APAR is contained
    in the following maintenance package:
    		 | release\fix pack\interim fix for  Release 7.6.1.0 of Base
    Services(Scheduler 7671)
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ04258

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-02-19

  • Closed date

    2018-04-17

  • Last modified date

    2018-04-17

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
17 April 2018