IJ04256: IFIX 7.6.0.9 GS - % COMPLETE COLORING IS NOT WORKING PROPERLY FOR CRITICAL PATH BARS

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • PROBLEM: The Critical Path color is getting overright the %
    complete green color
    App Server  IBM WebSphere Application Server 8.5.5.9
    Version  Tivoli's process automation engine 7.6.0.9 Build
    20171122-0309 DB Build V7609-45IBM TPAE Integration Framework
    7.6.1.0 Build 20171121-2330 DB Build V7610-03IBM Maximo Asset
    Management Scheduler Plus 7.6.7.0 Build 20171122-0309 DB Build
    V7670-01IBM Maximo Asset Management Scheduler 7.6.7.0 Build
    20171122-0309 DB Build V7670-56IBM Maximo Asset Management Work
    Centers 7.6.0.3 Build 20171121-0723 DB Build V7603-175
    Server OS  Windows Server 2012 R2 6.3
    Server DB  DB2/NT64 10.5 (SQL10058)
    (c) Copyright IBM Corp. 2017
    Pre Conditions
    - Create some Work that has predecessor it other
    - Create a Schedule at the Graphical Scheduling application
    that bring those work orders
    Steps to Reproduce
    1-) Go to the Graphical Scheduling application
    2-) Open you project and move to the More Information tab
    3-) At the Percent Complete change from NONE to Physical
    4-) Click at Graphical View tab and click select column - add
    the Physical % complete column
    5-) Scroll to the Physical column and Set some Work Order to 100
    6-) Under the More actions menu run the Calculate % complete
    7-) After it back you should get the Work Order complete Bar as
    Green
    8-) Now click at the Critical Path button at toolbar
    PROBLEM: The work that was green get override by the Critical
    Path color
    EXPECT RESULT: We should not lose the % complete color
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Scheduling application.               *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * % COMPLETE COLORING IS NOT WORKING PROPERLYFOR CRITICAL PATH *
    * BARS                                                         *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been delivered.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ04256

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    767

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-02-19

  • Closed date

    2018-04-29

  • Last modified date

    2018-04-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R767 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
29 April 2018