APAR status
Closed as program error.
Error description
App Server IBM WebSphere Application Server 8.5.5.9 Version Tivoli's process automation engine 7.6.0.9 Build 20171122-0309 DB Build V7609-45IBM TPAE Integration Framework 7.6.1.0 Build 20171121-2330 DB Build V7610-03IBM Maximo Asset Management Scheduler Plus 7.6.7.0 Build 20171122-0309 DB Build V7670-01IBM Maximo Asset Management Scheduler 7.6.7.0 Build 20171122-0309 DB Build V7670-56IBM Maximo Asset Management Work Centers 7.6.0.3 Build 20171121-0723 DB Build V7603-175 Server OS Windows Server 2012 R2 6.3 Server DB DB2/NT64 10.5 (SQL10058) (c) Copyright IBM Corp. 2017 Pre Conditions - Create some Work that needs resource effort - Create a Schedule at the Graphical Scheduling application that bring those work orders Steps to Reproduce 1-) Go to the Graphical Scheduling-Large Projects application 2-) Open you project and move to the Cost and Usage tab 3-) Move to the subtab Resource Load & Availability and click at the Calculate Labor Hours 4-) Check the Weekly and Monthly tabs you have a value 5-) Go to Graphical View and Change the Bucket visualization at Resources for Weekly 6-) Press ALT + CLICK over the Yellow or Blue bars at the Resource side PROBLEM: The tooltip will be showed with DAY parameters not Weekly EXPECT RESULT: The Tooltip should show same as the Graphical indicator as Load and Availability Same Happen for Monthly bucket.
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: * * Users of the Graphical Scheduling Large Projects application * * in Scheduler 7.6.7 * **************************************************************** * PROBLEM DESCRIPTION: * * TOOLTIP BUCKET - WEEKLY AND MONTHLY TOOLTIPS FORRESOURCES * * IS NOT DISPLAYING THE WEEKLY AND MONTHLY INFORMATION * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
A code fix has been delivered.
Temporary fix
Comments
APAR Information
APAR number
IJ04253
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-02-19
Closed date
2018-04-29
Last modified date
2018-04-29
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
R767 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
29 April 2018