APAR status
Closed as program error.
Error description
The following issue was reproduced in 7608 using Scheduler 765. 1. Create a new work order and from the location field, hyper link over to the location application. The Work Zones tab, we need to make sure that the work zone is populated. 2. Add an asset that belongs to the same location used in step 1. make sure that the asset used does not have a work zone associated to it. 3. On the Plans tab, add a craft, hyper link over to the crafts application and confirm that the craft being used has a work zone type specified against it. Return with the value and save. Move to the Assignments tab, expand the assignments tab and look at the Work Zone field, it is empty, it should have been populated.
Local fix
n/a
Problem summary
**************************************************************** * USERS AFFECTED: * * maximo users * **************************************************************** * PROBLEM DESCRIPTION: * * WORK ZONE FIELD ON THE ASSIGNMENTS TAB IS NOT BEING * * POPULATED. * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
Fix has been made to fix....The fix for this APAR is contained in the following maintenance package: | release\fix pack\interim fix for Release 7.6.0.10 of Base Services
Temporary fix
Comments
APAR Information
APAR number
IJ02488
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
765
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-12-07
Closed date
2017-12-11
Last modified date
2017-12-11
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
R765 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"765","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
11 December 2017