IBM Support

IJ02388: IN GRAPHICAL ASSIGNMENT WHEN AN ASSIGNMENT IS MADE MANUALLY ON THE ASSIGNMENT VIEW TAB IT DISSAPPEARS WHEN YOU SAVE

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • In Graphical Assignment when the user manually assigns a
    required assignment to an available Labor, when they click Save
    the Assignment is no longer seen.
    
    I cannot reproduce this but the client sent in a log file
    showing this Exception:
    
    11/30/17 12:08:49:810 CET] 00001813 SystemOut     O 30 Nov 2017
    12:08:49:810 [ERROR] [maximoui1] [] BMXAA4636E - The finish
    date must be later than the schedule date.
    psdi.util.MXApplicationException: BMXAA4636E - The finish date
    must be later than the schedule date.
       at
    psdi.app.workorder.FldAssignFinishDate.action(FldAssignFinishDat
    e.java:64)
    
    Steps to Reproduce:
    1. Create a Work List in Graphical Assignment (GA)
    2. Go to the Assignment tab
    3. Manually assign a labor by dragging the assignment down to t
        an available Labor
    4. Save
    
    Now you will see the problem, the Assignment you made is no
    longer there.
    

Local fix

  • (none)
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of the Graphical Assignment application in Scheduler   *
    * 7.6.5                                                        *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * IN GRAPHICAL ASSIGNMENT WHEN AN ASSIGNMENT IS MADE MANUALLY  *
    * ON THE ASSIGNMENT VIEW TAB IT DISSAPPEARS WHEN YOU SAVE      *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A code fix has been delivered.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ02388

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    765

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2017-12-04

  • Closed date

    2017-12-05

  • Last modified date

    2017-12-05

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R765 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"765","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
05 December 2017