Endnotes:
Your Results
Based on your inputs when comparing to x86, IBM® LinuxONE and Linux on Z could lower the cost of your workloads with
Based on your inputs when comparing IBM® LinuxONE and Linux on Z to x86:
IBM® LinuxONE and Linux on Z could lower the cost of your workloads over years by $ with
- TCO reduced by % in years
- ROI = %
Your x86 server inputs
Servers | Type of servers | Workload | Processors per server | Cores per x86 server | # of physical production servers | # of physical non-production servers1 | Total DR servers2 | Total x86 servers | Total x86 cores |
---|
1. For each set of production workloads is an additional 100% of corresponding physical servers for the DevTest and Quality Assurance non-production environment. A production workload environment of 100 cores, for example, is assumed to require another 100 cores for supporting non-production DevTest and QA work.
2. The DR environment is assumed to replicate the production environment only, so corresponding non-production workloads are not included for DR.
IBM® LinuxONE and Linux on Z alternative
IBM® LinuxONE and Linux on Z model | Type of servers | Workload | # of IBM® LinuxONE and Linux on Z servers | # of IBM® LinuxONE and Linux on Z production cores | # of IBM® LinuxONE and Linux on Z non-production cores1 | Total DR servers2 | Total DR cores2 | Total IBM® LinuxONE and Linux on Z servers | Total IBM® LinuxONE and Linux on Z cores3 |
---|---|---|---|---|---|---|---|---|---|
19-inch frame |
1. For each set of production workloads are an additional 75% corresponding DevTest and Quality Assurance non-production environments that can reside within the same physical IBM® LinuxONE and Linux on Z server. A production workload environment of 10 cores, for example, is assumed to require another 7.5 cores for supporting non-production DevTest and QA work.
2. The DR environment is assumed to replicate the production environment only, so corresponding non-production workloads are not included for DR.
3. Total required IBM® LinuxONE and Linux on Z cores are rounded up to the next whole number of cores.
CO2 Emissions
Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | 5 Year Total | |
---|---|---|---|---|---|---|
Yearly kWh | ||||||
Emissions (CO2 Eqv) |
Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | 5 Year Total | |
---|---|---|---|---|---|---|
Yearly kWh | ||||||
Emissions (CO2 Eqv) |
Year Category Cost Comparison
Key Cost Category | x86 Solution | IBM® LinuxONE and Linux on Z Solution |
---|---|---|
Application/Database SW | ||
Linux OS SW | ||
Systems Management and Virtualization SW | ||
Electricity | ||
Space |
Interested in seeing a breakout of costs based on your inputs? Download your personalized TCO report.