IMS Program Restart Facility for z/OS features

Restart automation of BMP programs

Automate the restarting of IBM® IMS™ Batch Message Processing (BMP) programs and IMS Batch DLI/DBB Batch programs. Avoid the manual and error-prone process of identifying the last valid Checkpoint ID for the batch program and the associated log data sets to include in the restart job. Determine what is required to restart a batch program and dynamically create the restart job with the correct Checkpoint ID and IMS log data sets.

Backout and Restart options

Take advantage of options that allow IBM IMS Program Restart Facility for z/OS® to automatically drive the backout and restart processes as part of the application job step. With these options, there is no need to run a separate IMS Batch Backout job or modify the restart job JCL following an abnormal termination.

Checkpoint creation in batch programs

Invoke IMS Program Restart Facility for z/OS every time a BMP program or IMS Batch DLI/DBB program issues a Checkpoint (CHKP) call. Optionally track time between checkpoints, and if too long, alert the user. You can also check if the batch application is creating too many checkpoints and bypass checkpoint processing to conserve CPU and resource usage.

Backout on demand

Recognize the need for Backout during job abnormal termination for IMS Batch DLI/DBB programs and take control of the termination process. If IMS Program Restart Facility for z/OS determines that Backout is required, it ensures that the log data set is closed, and drives the backout process before it allows the termination process to complete.

Automatic batch programs Restart

Use the special checkpoint data sets that were created when the original IMS BMP or IMS Batch DLI/DBB program was executed to determine the need for restarting the program. If IMS Program Restart Facility for z/OS determines that Restart is required, it automatically allocates the correct log data sets to the job and modifies the job execution parameters to allow the Restart to be performed automatically.

Database availability after failure

Improve IMS database availability after batch program failures by closing the log data set for IMS Batch DLI/DBB programs requiring Backout and performing Backout automatically as part of the abnormal termination process. This feature releases database locks and allows online processing to continue for the affected databases.

Technical details

Software requirements

Use the link below to access detailed software requirements for IMS Program Restart Facility for z/OS.

    Hardware requirements

    Use the link below to access detailed hardware requirements for IMS Program Restart Facility for z/OS.

      You may also be interested in

      IMS High Performance System Generation Tools for z/OS

      Improve application resource changes

      Learn more

      IMS Sysplex Manager for z/OS

      Effectively manage multiple IMS systems

      Learn more

      IMS Queue Control Facility for z/OS

      Better management of IMS message queues

      Learn more

      IMS Extended Terminal Option Support for z/OS

      Seamlessly manage your IMS ETO environment

      Learn more

      IMS Configuration Manager for z/OS

      Analyze and compare IMS configurations with ease

      Learn more

      IMS Connect Extensions for z/OS

      Enhance the manageability of TCP/IP access to IMS

      Learn more