Starting the 5104-22C, 9006-12P, 9006-22C, or
9006-22P system
To start the system, complete the steps in this procedure.
About this task
Attention: For safety, airflow purposes and thermal performance, the
service access cover must be installed and fully seated before you power on the system.
You can use this procedure to power on the system; or you can use a console and the
IPMI tool to power on the system.
Procedure
Before you press the power button, ensure that the power supplies are connected to the system
unit and that the power cables are connected to a power source.