Installing the IBM® Power® System S821LC (8001-12C) system
Learn how to install, cable, and set up your 8001-12C system.
- Prerequisites for installing the rack-mounted 8001-22C system
Use the information to understand the prerequisites that are required for installing the system. - Completing inventory for your system
Use this information to complete inventory for your system. - Determining and marking the location in the rack for the 8001-12C system
You might need to determine where to install the system unit into the rack. - Attaching the rails to the system chassis and to the rack
You must install the rails onto the chassis and into the rack. Use this procedure to perform this task. - Installing the system into the rack and connecting and routing power cables
After you install the system onto the rails in the rack, connect and route power cables. - Completing server setup
Learn how to complete server setup.