Alter consideration
Installations that have altered the size of a structure to a size different from either SIZE or INITSIZE in the CFRM policy need not necessarily update those values in the policy before attempting to rebuild the structure.
Installations that have altered the size of a structure to a size different from either SIZE or INITSIZE in the CFRM policy need not necessarily update those values in the policy before attempting to rebuild the structure.