EZA5789E Cannot connect to LU name — No more CONNBLOKs!
Explanation
SNALINK does not have enough data structures (CONNBLOKs) allocated to service a pending connection. The pending connection is severed. If existing connections are later closed, resources are freed to allow SNALINK to service this connection.
System action
SNALINK continues processing.
Operator response
No action is needed.
System programmer response
Increase the maximum connections allowed.
Module
SNALINK
Procedure name
pendconn