Previous topic |
Next topic |
Contents |
Contact z/OS |
Library |
PDF
Verifying that the copy process was successful IBM Infoprint XT for z/OS GI11-9492-01 |
|
You can review the processing information for the resource-copy operation to determine whether it completed successfully. The data set that you specified with the SYSPRINT DD statement contains the information. The type of information that Infoprint XT writes depends on the type of resources that you copied. Also, if Infoprint XT could not copy one or more of the resources, the overall return code for the resource-copy process is non-zero. Figure 1 is an example of a resource-copy operation that was successful. Because this information is lengthy, and includes the names of all of the resources, the example is in abbreviated format Figure 1. Example of a successful
resource-copy operation
Should any errors occur, the report includes error messages from Resource utility messages: 5017-nnn X (xxx). |
Copyright IBM Corporation 1990, 2014
|