Create a report task to customize and generate Tivoli Workload Scheduler reports, which you can then view, print, and save, in different kinds of output. Reports help you in many business-related activities, such as:
| Report Name | Description | Output |
|---|---|---|
| Job Run History | Collects the historical job run data during a specified time interval. Use it to detect which jobs ended in error or were late. It also shows which jobs missed their deadline, long duration jobs, and rerun indicators for reruns. | Available in table format only. It can be HTML or CSV. |
| Job Run Statistics | Collects the job run statistics. Use it to detect success, error rates; minimum, maximum, and average duration; late and long duration statistics. | Available in graphic and table formats. It can be HTML or CSV. |
| Workstation Workload Summary | Shows the workload on the specified workstations. The workload is expressed in terms of number of jobs that ran on them. It helps for capacity planning adjustments (workload modelling and workstation tuning). | Available in graphic and table formats. It can be HTML or CSV. |
| Workstation Workload Runtimes | Shows job run times and duration on the specified workstations. It helps for capacity planning adjustments (workload modelling and workstation tuning). | Available in graphic and table formats. It can be HTML or CSV. |
| Custom SQL | Allows you to create reports that best fit your business needs. You can specify an SQL query or import SQL scripts. | Available in table format only. It can be HTML or CSV. |
| Planned Production Details | Extracts information about planned production plans into either an XML or a CSV format, to be used respectively, with Microsoft Project and Microsoft Excel. This also allows users who do not know Tivoli Workload Scheduler to access plan information in a familiar format. | Available in CSV or XML format only. |
| Actual Production Details | Extracts current plan information into either an XML or a CSV format, to be used, respectively, with Microsoft Project and Microsoft Excel. This also allows users who do not know Tivoli Workload Scheduler to access plan information in a familiar format. | Available in CSV or Microsoft Project format only. |