Migrating
This topic provides information to help you plan your migration from IBM Z Workload Scheduler versions 9.5 and 10.1 to the current version.
- Created a backup copy of the data sets that you are going to migrate, which you specify in the FILE parameter of the CONVERT statement (for details, see EQQICTOP VSAM data set conversion program).
- Modified all your fault-tolerant agents to z-centric agents, as described in Modifying the workstation from fault-tolerant agent to z-centric agent.
- Modified any shared DASD tracker-to-controller connection to a supported connection, as described in Changing a shared DASD tracker-to-controller connection to an NCF, XCF, or TCP/IP connection.
- Installed the required PTFs, which are listed in the EQQICNVS sample job.