Installation and verification
If you are migrating to existing subsystem definitions, it is required that you perform the
following installation tasks:
- Load the tracker software (Step 1. Loading tracker software).
- Load the Z controller software (Step 2. Loading controller software).
- Load the NLS software (Step 3. Loading national language support software).
- Run the EQQJOBS CLIST (Step 4. Using the EQQJOBS installation aid).
- Install JES and SMF exits at IBM Z Workload Scheduler level (Step 5. Adding SMF and JES exits for event tracking).
- Update PARMLIB (Step 6. Updating SYS1.PARMLIB).
- Import the new default security certificates for HTTP connections (Step 8. Securing communications).
- Allocate VSAM and non-VSAM data sets (Step 9. Allocating data sets).
- Update the JCL procedure for the IBM Z Workload Scheduler address space (Step 10. Creating JCL procedures for address spaces).
- Update the initialization statements (Step 11. Defining the initialization statements).
- Update the ISPF environment (The ISPF environment).
Ensure that you follow the subsystem verification procedures described in Verifying your installation.
Note: Verify
that all the IBM Z Workload Scheduler parameters
defined in the previous release are still valid in the current release.