Performing fallback

If a problem occurs after IBM Z Workload Scheduler has been active as a production system for some time, and the problem is serious enough, you might need to stop the new system and return the workload to the previous system. You can do this by copying back the IBM Z Workload Scheduler data sets that you backed up before migrating to the current version; in this way, you return to the previous release and any modifications made or events generated after migration are overwritten.
Note: If on the primary controller the Step Awareness feature was active and you want to keep it in the previous system, ensure that you convert the EQQSTDS data set.