From the Ready List dialog, review the status of active operations.
Check that the operations that are becoming ready on the workstations
representing the three z/OS systems
are successfully submitted to
the intended system. Also check that the ending status is correctly
reflected in the ready lists.
Verify that the current plan
and the long-term plan can be extended
successfully.
Verify that other IBM Z Workload Scheduler-related
processes (for example, the
dialogs, batch programs, and PIF-based programs) work as expected.