Migrating
This topic provides information to help you plan your migration from IBM Z Workload Scheduler versions 9.5 and 10.1 to version 10.2.
- Modified all your fault-tolerant agents to z-centric agents, as described in Modifying the workstation from fault-tolerant agent to z-centric agent.
- Modified any shared DASD tracker-to-controller connection to a supported connection, as described in Changing a shared DASD tracker-to-controller connection to an NCF, XCF, or TCP/IP connection.
- Installed the required PTFs, which are listed in the EQQICNVS sample job.