Using the Program Directory
The IBM Z Workload Scheduler: Program Directory contains instructions for downloading the product and might include technical information that is more recent than the information provided in this publication.
In addition, the Program Directory describes the program temporary fix (PTF) level of the IBM Z Workload Scheduler licensed program that you receive.
Before you start installing the product, check the preventive service planning (PSP) bucket for recommendations added by the service organizations after your Program Directory was produced. The PSP bucket includes a Service Recommendations section that includes high impact or pervasive (HIPER) APARs. Ensure the corresponding PTFs are installed before you start an IBM Z Workload Scheduler subsystem.