Restoring the Special Resource Description (RD) data set

To restore the RD data set:
  1. Stop IBM Z Workload Scheduler.
  2. Allocate a new RD data set.
  3. Copy the backup data set to the RD data set.
  4. If you allocated the data set with a new name, update all JCL (ddname EQQRDDS) to reference the new RD data set.
  5. Start IBM Z Workload Scheduler.
  6. Enter the Special Resource Descriptions dialog to verify that special resources are correctly defined. Reapply all changes made since the RD backup was created.