An integration scenario
This section shows how you can monitor late critical
jobs and perform incident management, by integrating IBM® Z Workload Scheduler with the
following products:
- IBM Tivoli® Monitoring (ITM)
- IBM SmartCloud® Control Desk (SCCD)
- Tivoli System Automation (SA)
The integrate components work as follows:
- ITM detects a critical job tied to a WLM scheduling environment.
- ITM sends an email causing the automatic opening of a service request.
- The SCCD operator captures the service request and runs a launch in context of the Dynamic Workload Console, to perform incident analysis.
- The analysis confirms that a critical job is waiting for a WLM scheduling environment.
- A System Automation job is submitted through Dynamic Workload Console, to make available the WLM scheduling environment.
- As soon as the WLM scheduling environment is available, the scheduler submits again the critical job.
- The service request is closed.