Configuration steps for a dynamic domain manager configured as backup
After you install a dynamic domain manager as
backup, perform the following configuration steps:
- Log in as TWS_user on your master domain manager
- Set the environment variables by running tws_env as described in Setting the environment variables.
- Define the dynamic domain manager as
backup as a full status autolink fault-tolerant agent in the IBM Workload Scheduler database,
using the composer command interface or the Dynamic Workload Console.
In this example using composer, type:
composer new
- Type the workstation definition in the text editor, for example:
For more information about workstation definitions, see Workstation definition .CPUNAME BDDM1 DESCRIPTION "backup dynamic domain mananger" OS UNIX NODE lab00777 TCPADDR 31111 DOMAIN DYNAMICDM FOR MAESTRO TYPE FTA AUTOLINK ON BEHINDFIREWALL OFF FULLSTATUS ON END
- Run JnextPlan -for 0000 to include the dynamic domain manager as backup workstation in the
plan and to send the Symphony file to it. Note: Ensure that the global option carryforward is set to all, otherwise only incomplete job streams are carried forward.
- Change the workstation limit to allow jobs to run on the workstation.
For example, set the number of jobs to run concurrently on the workstation
to 10:
conman "limit;10"