Upgrading from the CLI
Upgrade IBM Workload Scheduler from the command-line interface.
The upgrade procedure varies depending on the product version you currently have installed:
- if you have installed version 9.5.0.x and want to upgrade to the General Availability version or to the latest fix pack level with a direct upgrade procedure, see Performing a direct upgrade from v 9.5.0.x to v 10.1.0.x.
- if you have installed version 9.5.0.x and want to upgrade to the General Availability version or to the latest fix pack level with a parallel upgrade procedure, see Parallel upgrade from version 9.5.0.x to version 10.1.0.x. This procedure might be useful when you have you have some of your components installed on operating systems which are no longer supported in version 10.1.0.x and therefore cannot perform a direct upgrade.
- if you have installed version 9.4.0.x and want to upgrade to version 9.5.0.x or to 10.1.0.x. In this case, only a parallel upgrade is supported. For more information, see Parallel upgrade from version 9.4.0.x to version 9.5.0.x or 10.1.0.x.