Changing the Sequence of a Processing Rule
Arrange the rules in the sequence that you require so that the processing rules with specific criteria are listed over the rules with general criteria. Also, the default rule does not ignore any document. IBM webMethods B2B uses the default rule to match any document that does not match any other processing rule that you defined.
To change the sequence of a processing rule
- In IBM webMethods B2B, go to Rules
> Processing rules.
- Select the processing rule.
- Move the selected processing rule up
or down
in the processing sequence:
- To move up, click
to decrease the sequence number of the processing rule.
Using the example of the Steering supplier 2 rule in the image in the previous step, moving up means that the processing rule at sequence 11, changes to position 10. Later, an inbound document first tries to match with Steering supplier rule before it tries to match with the Tyre supplier rule.
- To move down, click
to increase the sequence number of the processing rule.
Using the example of the Steering supplier 2 rule in the image in the previous step, moving down means that the processing rule at sequence 11, changes to position 12. Later, an inbound document first tries to match with Seat supplier rule before it tries to match with the Steering supplier rule.
Tip: If you have a large list of processing rules, clickto set a target sequence number to move a processing to a specific position and click Move.