Changing Logging Levels
About this task
You can change the logging levels for Adapter for IBM Power in Integration Server using Integration Server Administrator.
Perform the following steps to change logging levels for the adapter:
You can change the logging levels for Adapter for IBM Power in Integration Server using Integration Server Administrator.
Perform the following steps to change logging levels for the adapter: