Flow validation

You can validate a flow to determine if it is complete and valid. To validate a flow, the flow must be configured to use an environment.

Flow validation performs the following validation:
  • Implicit validation - Checks for missing or incomplete configuration, such as an unconnected stage or a required property that has not been configured.
  • Semantic validation - Checks all configured values for validity and verifies whether the flow can run as configured.

Validation errors display in the Problems table. You can copy or download the information in the table for easy reference.

To review validation errors for a flow, click the Validate icon.