Stopping a copy request
You can use the standard Stop (P) operator command to stop a copy request in a controlled manner that enables current copy processing to complete.
About this task
To stop a copy request in this manner, issue the Stop operator command from a z/OS operator console, as follows:
P job_nameOr issue the command from SDSF, as follows:
/P job_nameWhen you restart the copy request, Tape Optimizer will resume the copy operation from the point at which it stopped.