IBM Tivoli Storage Manager, Version 7.1

Migration scenario 4: Using the network method and the command line

Use this procedure if you are migrating the server database by using the network method and the command line. By applying the network method, you simultaneously extract data from the original database and load the data into the new database over a network connection. By using administrative commands, you migrate the system manually.

Procedure

To migrate the system by using Migration scenario 4, complete the following steps:

  1. Ensure that you have completed the planning tasks. See Planning the migration.
  2. Ensure that you have completed the preparation tasks. See Preparing for the migration.
  3. Complete the tasks that are described in the following topics:
    1. Migration scenario 4: Preparing the database of the V5 server
    2. Migration scenario 4: Installing the V7.1 server
    3. Migration scenario 4: Setting up devices
    4. Migration scenario 4: Creating the user ID and directories for the server instance
    5. Migration scenario 4: Creating the server instance and database
    6. Migration scenario 4: Moving the server database over a network
    7. Migration scenario 4: Configuring the system for database backup

What to do next

After you complete the planning, preparation, and migration steps, complete the post migration tasks. See Taking the first steps after migration.


Feedback