No reset occurs after a start control operation timeout
The operation timer is started when IBM® Tivoli® System Automation first
sends a resource start control operation to a resource. If the resource
does not reach the desired state (online) within the timeout period
and IBM Tivoli System Automation fails to issue a reset
operation against the resource, perform the following steps:
- Stop the cluster using the stoprpdomain command.
- Restart the cluster using the startrpdomain command.