Delivery route
The TS4500 tape library must be delivered using a planned route. Check the delivery route that the library must travel from your loading dock to the installation location. Ensure that the library will fit through all doors, hallways, and elevators.
You must remove the library from the pallet and place it at the final location before you call your IBM Service Representative to arrange for the installation. Refer to the instructions on the shipping carton for correct unpacking procedures.
Because of the size and weight of this product, the transportation of this equipment must be performed by professional movers or riggers who are trained to handle large heavy objects. The IBM-authorized service provider will only perform minimal frame repositioning within the computer room, as needed, to perform required service actions.