Ending procedure
Procedure
- Reassemble the drive brick by reversing the steps in Removing the drive cover.
-
Reassemble the drive sled and reinstall the drive brick by completing these steps:
- Plug in the RS-422 cable, the power cable (if applicable), and the signal cable.
- Push the drive brick fully into the sled.
- Align the two screws holes on each side of the sled with the screw holes on each side of the
drive brick. DO NOT TIGHTEN THE SCREWS COMPLETELY.
- When the drive and sled are properly aligned, fully tighten the screws.
-
Install the tape drive sled in the library.
-
Power ON the library and wait for the library to finish POST (power on self test), inventory,
and mid-tape recovery. This step can take up to 1 hour.
-
If the cartridge does not eject from the drive, move the cartridge from the drive to the I/O
station, then discard the cartridge.
- Operator Panel:
- Management GUI:
-
Run Library Verify before normal library operations resume.
- If necessary, return the failed drive sled to IBM.