Work plan records
You can use the work plan record to view the availability for employees at specific times of each work day. You can then assign tasks from the backlog or unassigned current demand.
The work plan record also contains details about the parameters that determine the length of time for the work plan. You can specify the rebuild of the schedule, which determines how often the work plan data is regenerated. By default, rebuilds are scheduled daily.