Occupancy Cost per Person
The Occupancy Cost per Person scenario metric calculates the occupancy cost per person for the scenario.
Item | Description |
---|---|
Name | Occupancy Cost per Person |
Metric category | Portfolio |
Metric objective | Calculate the occupancy cost per person for the scenario |
Measurement | Total Occupancy Costs / Total People Total Occupancy Costs = A+B+C A = Cost of Operations = The sum of Supply Summary’s Cost of Operations field; includes leased, owned, and proposed locations; includes only records that are in the current focus period; for a proposed location, the system uses the Estimated Annual Cost of Operations per RSFfield from the selected Building Class to calculate the Estimated Cost of Operations; for an existing building or an existing lease, the system maps the Annual Cost of Operations field to the Supply Summary. B = Lease Costs = The sum of Supply Summary’s Annual Lease Costs; includes leased, owned, and proposed locations; includes only records that are in the current focus period; for a proposed location (lease or owned), the system uses Estimated Annual Lease Costs per RSF from the selected Building Class to calculate the Estimated Annual Lease Costs field; for an existing building, the system maps the Annual Lease Costs field to the Supply Summary; for an existing lease, the system maps the Annual Spend (Estimated) field to the Supply summary (this field displays on the Summary tab). C = Fixed Assets (Property) Costs = The sum of Supply Summary’s Fixed Asset Costs field; includes leased, owned, and proposed locations; includes only records that are in the current focus period; for a proposed location (lease or owned), the system uses the Estimated Annual Fixed Asset Costs per RSF field from the selected Building Class to calculate the Estimated Fixed Asset Costs field; for an existing building or existing lease, the system maps the Annual Fixed Asset Costs to the Supply Summary. Total People = The sum of the Quantity fields from the Planning Data (Demand) where the Planning Measure Type = Occupancy. |
Default thresholds | Low Threshold: 3958 High Threshold: 7259 Range 1: Good/Positive/Green Range 2: Marginal/Caution/Yellow Range 3: Poor/Negative/Red |
Default target | 3958.00 US Dollars |