Example Projected Savings Report

The following information is provided in the Advanced Allocation Management Projected Savings Report.

Report options in effect

The REPORT OPTIONS IN EFFECT section displays the report options that were configured in the SMF Reporting Utility JCL. For example:

TIVOLI ADVANCED ALLOCATION MANAGEMENT PROJECTED SAVINGS REPORT       
                                                                     
REPORT CREATED ON 2013/05/07 09:54:36                                
                                                                     
REPORT OPTIONS IN EFFECT:                                            
  DATA SET CONTAINING SMF RECORDS                                    
    SMF_DATASET                   : TSJRH.GLOSMFRP.SMFDATA.MAY0613   
  MONEY                                                              
    MONETARY_UNIT                 : EUROS                            
  CPU TIME LOST COST BASIS                                           
    CPU_TIME_COST_PER_HOUR        : 1000 EUROS                       
  ELAPSED TIME LOST COST BASIS                                       
    ELAPSED_TIME_COST_PER_HOUR    : 1000 EUROS                       
  AVERAGE ABEND RECOVERY TIME                                        
    AVERAGE_ABEND_RECOVERY_TIME   : 10 MINUTES                       
  ABEND RECOVERY COST BASIS                                          
    ABEND_RECOVERY_COST_PER_HOUR  : 100 EUROS                        
  ABEND DETAIL REPORT SORTED BY                                      
    SORT_BY                       : DATETIME                         

Totals for the reporting period

The TOTALS FOR THE REPORTING PERIOD section displays the total estimated monetary cost of the time that is lost due to recoverable space abends. For example:

TOTALS FOR THE REPORTING PERIOD                                      
  TOTAL CPU TIME LOST             : 0:00:00.96                       
  TOTAL COST CPU TIME LOST        : 0 EUROS                          
  TOTAL ELAPSED TIME LOST         : 0:00:12.86                       
  TOTAL COST ELAPSED TIME LOST    : 4 EUROS                          
  TOTAL NUMBER RECOVERABLE ABENDS : 36                               
  TOTAL RECOVERY TIME LOST        : 6:00:00.00                    
  TOTAL COST RECOVERY TIME LOST   : 600 EUROS                     
                                                                  
  TOTAL COST FOR REPORTING PERIOD : 604 EUROS                     

Projected annualized savings

The PROJECTED ANNUALIZED SAVINGS section displays the total projected annualized monetary savings that are related to CPU time, elapsed time, and recovery time that might potentially be saved by avoiding space abends. For example:

PROJECTED ANNUALIZED SAVINGS BASED ON SMF DATA REPORTING 
 PERIOD FROM 2013/05/06 07:49:43 TO 2013/05/06 19:23:57
  TOTAL YEARLY COST CPU LOST      : 202 EUROS                     
  TOTAL YEARLY COST ELAPSED LOST  : 2,704 EUROS                   
  TOTAL YEARLY COST RECOVERY LOST : 454,200 EUROS                 
                                                                  
  TOTAL COST FOR ALL TIME LOST    : 457,106 EUROS                 

Recoverable abends summary

The RECOVERABLE ABENDS SUMMARY section displays a breakdown of costs per abend type. For example:

RECOVERABLE ABENDS SUMMARY                                        
  ABEND B37/E37 - INSUFFICIENT SPACE ABENDS                       
    TOTAL NUMBER RECOVERABLE ABENDS : 10                          
    TOTAL CPU TIME LOST             : 0:00:00.20                  
    TOTAL COST CPU TIME LOST        : 0 EUROS                     
    TOTAL ELAPSED TIME LOST         : 0:00:06.28                  
    TOTAL COST ELAPSED TIME LOST    : 2 EUROS                     
    TOTAL RECOVERY TIME LOST        : 1:40:00.0                   
    TOTAL COST RECOVERY TIME LOST   : 167 EUROS                   
    TOTAL COST FOR REPORTING PERIOD : 169 EUROS                   
                                                                  
  ABEND D37 - UNDEFINED SECONDARY SPACE ABENDS                    
    TOTAL NUMBER RECOVERABLE ABENDS : 14                          
    TOTAL CPU TIME LOST             : 0:00:00.14                  
    TOTAL COST CPU TIME LOST        : 0 EUROS   
    TOTAL ELAPSED TIME LOST         : 0:00:01.02
    TOTAL COST ELAPSED TIME LOST    : 0 EUROS   
    TOTAL RECOVERY TIME LOST        : 2:20:00.0 
    TOTAL COST RECOVERY TIME LOST   : 233 EUROS 
    TOTAL COST FOR REPORTING PERIOD : 233 EUROS 
  ABEND B14 - PDS DIRECTORY ABENDS              
    TOTAL NUMBER RECOVERABLE ABENDS : 12        
    TOTAL CPU TIME LOST             : 0:00:00.62
    TOTAL COST CPU TIME LOST        : 0 EUROS   
    TOTAL ELAPSED TIME LOST         : 0:00:05.56
    TOTAL COST ELAPSED TIME LOST    : 2 EUROS   
    TOTAL RECOVERY TIME LOST        : 2:00:00.0 
    TOTAL COST RECOVERY TIME LOST   : 200 EUROS 
    TOTAL COST FOR REPORTING PERIOD : 202 EUROS 
                                                
                                                
PROCESSING IS COMPLETE; RETURN CODE IS 00       

Recoverable abend details report

The RECOVERABLE ABEND DETAILS REPORT section displays statistics that are based on the SMF records that are specified as input to the report on the SMF_DATASET parameter. For example:

SYS  JOBNAME  STEPNAME PROGRAM  CMP  DATETIME            CPUTIME     ELAPSEDTIME
---  -------  -------- -------  ---- --------            -------     -----------
TST1 TSJRHAB1 STEPJAN  IEBDG    SD37 2013/05/06 19:14:28 00:00:00.01 00:00:00.22
TST1 TSJRHAB2 STEPJAN  IEBDG    SD37 2013/05/06 19:14:36 00:00:00.01 00:00:00.06
TST1 TSJRHAB3 DIRINC   IEBDG    SB14 2013/05/06 19:14:44 00:00:00.07 00:00:00.75
TST1 TSJRHAB4 STEPJAN  IEBDG    SD37 2013/05/06 19:15:08 00:00:00.01 00:00:00.05
TST1 TSJRHAB5 STEPJAN  IEBDG    SD37 2013/05/06 19:15:17 00:00:00.01 00:00:00.09
TST1 TSJRHAB6 DIRINC   IEBDG    SB14 2013/05/06 19:15:25 00:00:00.05 00:00:00.66
TST1 TSJRHAB7 STEPJAN  IEBDG    SD37 2013/05/06 19:15:30 00:00:00.01 00:00:00.06
TST1 TSJRHAB8 STEPJAN  IEBDG    SD37 2013/05/06 19:15:35 00:00:00.01 00:00:00.07
TST1 TSJRHAB9 DIRINC   IEBDG    SB14 2013/05/06 19:15:41 00:00:00.05 00:00:00.44
TST1 TSJRHABA STEPJAN  IEBDG    SD37 2013/05/06 19:15:54 00:00:00.01 00:00:00.05
TST1 TSJRHABB STEPSB37 IEBDG    SB37 2013/05/06 19:15:58 00:00:00.02 00:00:00.77
TST1 TSJRHABC STEPSB37 IEBDG    SB37 2013/05/06 19:16:01 00:00:00.02 00:00:00.53
TST1 TSJRHAB1 STEPJAN  IEBDG    SD37 2013/05/06 19:17:08 00:00:00.01 00:00:00.08
TST1 TSJRHAB2 STEPJAN  IEBDG    SD37 2013/05/06 19:17:13 00:00:00.01 00:00:00.07
TST1 TSJRHAB3 DIRINC   IEBDG    SB14 2013/05/06 19:17:17 00:00:00.05 00:00:00.48
TST1 TSJRHAB4 STEPJAN  IEBDG    SD37 2013/05/06 19:17:25 00:00:00.01 00:00:00.05
TST1 TSJRHAB5 STEPJAN  IEBDG    SD37 2013/05/06 19:17:29 00:00:00.01 00:00:00.05
TST1 TSJRHAB6 DIRINC   IEBDG    SB14 2013/05/06 19:17:34 00:00:00.05 00:00:00.43
TST1 TSJRHAB7 STEPJAN  IEBDG    SD37 2013/05/06 19:17:40 00:00:00.01 00:00:00.06
TST1 TSJRHAB8 STEPJAN  IEBDG    SD37 2013/05/06 19:17:45 00:00:00.01 00:00:00.06
TST1 TSJRHAB9 DIRINC   IEBDG    SB14 2013/05/06 19:17:49 00:00:00.05 00:00:00.55
TST1 TSJRHABA STEPJAN  IEBDG    SD37 2013/05/06 19:17:57 00:00:00.01 00:00:00.05
TST1 TSJRHABB STEPSB37 IEBDG    SB37 2013/05/06 19:18:01 00:00:00.02 00:00:00.80
TST1 TSJRHABC STEPSB37 IEBDG    SB37 2013/05/06 19:18:06 00:00:00.02 00:00:00.48
TST1 TSJRHAB3 DIRINC   IEBDG    SB14 2013/05/06 19:18:46 00:00:00.05 00:00:00.44
TST1 TSJRHAB6 DIRINC   IEBDG    SB14 2013/05/06 19:18:51 00:00:00.05 00:00:00.36
TST1 TSJRHAB9 DIRINC   IEBDG    SB14 2013/05/06 19:18:55 00:00:00.05 00:00:00.28
TST1 TSJRHAB3 DIRINC   IEBDG    SB14 2013/05/06 19:19:03 00:00:00.05 00:00:00.39
TST1 TSJRHAB6 DIRINC   IEBDG    SB14 2013/05/06 19:19:11 00:00:00.05 00:00:00.28
TST1 TSJRHAB9 DIRINC   IEBDG    SB14 2013/05/06 19:19:17 00:00:00.05 00:00:00.50
TST1 TSJRHABB STEPSB37 IEBDG    SB37 2013/05/06 19:20:17 00:00:00.02 00:00:00.86
TST1 TSJRHABC STEPSB37 IEBDG    SB37 2013/05/06 19:20:21 00:00:00.02 00:00:00.46
TST1 TSJRHABB STEPSB37 IEBDG    SB37 2013/05/06 19:20:26 00:00:00.02 00:00:00.72
TST1 TSJRHABC STEPSB37 IEBDG    SB37 2013/05/06 19:20:29 00:00:00.02 00:00:00.51
TST1 TSJRHABB STEPSB37 IEBDG    SB37 2013/05/06 19:20:35 00:00:00.02 00:00:00.68
TST1 TSJRHABC STEPSB37 IEBDG    SB37 2013/05/06 19:20:40 00:00:00.02 00:00:00.47
                                                                                
PROCESSING IS COMPLETE; RETURN CODE IS 00