After system recovery, configuration, and syncing the system
times, you must perform the system validation test.
Procedure
Run the test on both nodes, starting with Node 1.
- If you are not already connected to Node 1, plug a USB
keyboard and monitor into the back of the server.
- Log in to Node 1 with username ptadmin and
password ptadmin.
- At the command prompt, enter the
following command:
cd /opt/dtc/install
- From the command prompt, enter the
following command:
./ptconfig -validate
The following messages are displayed:Testing fence ports [Done ]
Validation is about to execute a fence on 1 node in the cluster, the
node will be forcefully shutdown and rebooted
To Continue please type "fence test", or "q" to quit:
- Type fence test. The
following messages are displayed:
Testing connectivity to the fence device [ Done ]
Would you like to stop the VTFD service on both nodes? (yes|no)
- Type yes. The following message is displayed:
Stopping VTFD locally [ - ]
- After vtfd is stopped and the test finishes on Node 1,
disconnect the keyboard and monitor from Node 1. Connect them to Node
2.
- Log in to Node 2 with username ptadmin and
password ptadmin.
- Repeat steps 3 through 6 on Node B.
Note: Alerts might be generated as the validation tests are
running. The
ProtecTIER Manager Alerts Log allows
you to monitor the alerts as they occur. To do so, on the
ProtecTIER® Manager workstation, click
Alerts in
the lower right corner of the
ProtecTIER Manager screen.
The
Alerts Log is displayed (
Figure 1).
When you are finished reviewing alerts, click Clear
Alerts in the lower-right corner of the Alerts
Log screen.
- If the test succeeds on both nodes, TS7650G installation
and setup is complete. Turn the system over to the customer and refer
them to the IBM® System Storage® ProtecTIER User's Guide for
Enterprise Edition and Appliance Edition, GA32-0922 for
information on customizing, using, and maintaining ProtecTIER; and creating,
configuring, and managing replication grids, if applicable.
- If the test fails on either node, contact your next level
of support to resolve the failure conditions.